Ensure compliance with our holistic solution

For particular applications it is a requirement to construct a pumping station which can be adopted by the local water authority.

Sewers for Adoption, published by WRc plc, provides technical guidelines. Most local water authorities will also require their own amendments to the design.

We offer services including design, specification, installation and commissioning of pumping stations suitable for adoption by the local water authority, which comply with all regulations.

We have worked closely with the water authorities for many years enabling us to offer a comprehensive service for delivering adoptable pumping stations.

Key features

  • Specification – meeting the Sewers for Adoption guidelines
  • Design – including CAD design and manufacturing drawings
  • Project management
  • Supply
  • Installation including electrical (to NICEIC standards) and control systems
  • Commissioning
  • Remote Monitoring
  • Servicing and maintenance

Showing the single result