Client
Main Contractor
Sector
Residential
Project Type
Installation
Products Used
MagnaProIP
Onsite Duration
5 days
Location
London
REQUIREMENTWe were asked to design, specify, install and commission two pump sets to pump foul and surface water separately from the basement of a new property. The pump sets were to be installed into pre-cast concrete chambers designed and cast by others. METHOD• We carried out a pre-installation confined space site survey to ensure that we anticipated any issues on site. RESULT• Galvanized steel pipework offers a long life span.
|
|