Food Outlet – Norwich Town Centre
Client

Sandwich / Hot food outlet

Sector

Retail

Project Type

Supply and installation

Products Used

Edincare AutoFlushSSTwin™

Onsite Duration

1 day

Location

Norwich City Centre

REQUIREMENT

During a scheduled service visit to a busy commercial kitchen in Norwich it was noted that the installed waste water pumping system was worn, un-repairable and would need to be replaced.

A replacement solution would receive water from three commercial sinks and a dishwasher via an existing greasetrap.

As the kitchen would be used throughout the installation it was important to minimise disruption.

METHOD

• The service engineers ascertained the pumping distances and required flow rates on the initial visit. An Edincare AutoFlushSSTwin™ was specified due to its hygienic and robust stainless steel construction.The twin pump system includes a backup pump in case of main pump failure. As standard the system includes a control panel with visual and audible alarms.

• The positions of inlets, vents and electrical connections were modified to integrate with the existing system.

• A technical project coordinator liaised with Edincare engineers and the client throughout to avoid disruption and ensure timely completion to a high standard.

RESULT

The system met all technical requirements and works, from concept to commissioning, were completed by Edincare within the agreed time frame and budget.

 

 

FOCUS ON:

 

MULTI-SKILLED TEAMS BRING COST AND TIME SAVINGS

Edincare’s site engineers are trained in all aspects of system installation from mechanical to electrical works.

We ensure compliance to safety regulations and train our staff for the conditions that they will encounter such as confined spaces and biological/chemical hazards.

This combination of skills means that for most projects a single site team can undertake all aspects of the work, which brings cost and time savings as well as a comprehensive oversight that affords the highest standards