Client
Main contractor
Sector
Residential
Project Type
Installation
Products Used
3 MagnaPro
Onsite Duration
3 days
Location
London
REQUIREMENTWe were asked to design, install and commission three large pumping stations to pump storm and foul waters from the basement of a new residential development in London. The biggest challenge that the project presented was the short lead time. METHOD• We carried out a site survey and specified chamber dimensions and access cover requirements. RESULT• We were able to offer rapid delivery of our MagnaPro range from stock, ready for fitment, with a range of bespoke pump configurations.
|
|